March 5, 2006
 31 items in this album on 8 pages  [slideshow] [login] 
 Gallery: AndrewDudas.com   
First Page Previous Page   1  2  3  4  5  6  7  8   Next Page Last Page

Album: June 23, 2003
The framing of the deck has begun!

Changed: Mar 06, 2006.
Contains: 9 items.
Viewed: 2035 times.
Album: July 2, 2003
Diagonal and perimeter blocking is installed to support the deck floor boards!

Changed: Mar 06, 2006.
Contains: 3 items.
Viewed: 548 times.
Album: July 5, 2003
Perimeter blocking completed; Diagonal floor boards laid.

Changed: Mar 06, 2006.
Contains: 5 items.
Viewed: 1438 times.
Album: July 15, 2003
Diagonal floor boards cut; several rows of picture framed floor boards laid; rail posts installed.

Changed: Mar 06, 2006.
Contains: 6 items.
Viewed: 1514 times.
First Page Previous Page   1  2  3  4  5  6  7  8   Next Page Last Page
 Gallery: AndrewDudas.com   
Powered by Gallery v1.3