Album: July 31, 2003
Outer perimeter of floor boards installed; Railings installed; Concrete footer for the steps poured.

Changed: Mar 06, 2006.
Contains: 9 items.
Viewed: 1788 times.
Album: August 10-11, 2003
Deck steps completed; Deck lighting installed (but not yet wired); Rear storm door installed.

Changed: Mar 06, 2006.
Contains: 11 items.
Viewed: 1970 times.
Album: September 7, 2003
Deck accoutrements in place; backyard bird feeder installed.

Changed: Mar 06, 2006.
Contains: 6 items.
Viewed: 1508 times.
Album: May 11, 2004
Deck Accent Lighting

Changed: Mar 06, 2006.
Contains: 3 items.
Viewed: 680 times.