| | |
|
| Album: July 31, 2003 Outer perimeter of floor boards installed; Railings installed; Concrete footer for the steps poured.
Changed: Mar 06, 2006.
Contains: 9 items.
Viewed: 1788 times.
|
| Album: August 10-11, 2003 Deck steps completed; Deck lighting installed (but not yet wired); Rear storm door installed.
Changed: Mar 06, 2006.
Contains: 11 items.
Viewed: 1970 times.
|
| | | | | |
|
| Album: September 7, 2003 Deck accoutrements in place; backyard bird feeder installed.
Changed: Mar 06, 2006.
Contains: 6 items.
Viewed: 1508 times.
|
| Album: May 11, 2004 Deck Accent Lighting
Changed: Mar 06, 2006.
Contains: 3 items.
Viewed: 680 times.
|
| | |
|